An Ugly Duckling in our Midst!

December 14, 2010  |   News   |   John Boynton  |   0 Comment  |   Print

The improvements are extensive and promise to make the Bradford Mill an even better place to work.  This is Phase 1 in what will be a multi-year project, but the benefits are already being felt.

  • Exterior Improvements.  Ancient clapboard siding on 23 and 33 Bradford will be replaced with durable Hardie Plank siding.  New, insulated low-E windows will be installed.  The entry ways will be updated.  The loading docks will be rebuilt.  Asphalt on the main parking lot will be repaired.
  • Interior Improvements.  We are going to install new, high efficiency HVAC in 23 Bradford as the first step toward retiring the 1939 boiler that currently heats the entire property.  A new stair core will be added to 33 Bradford.

The buildings are steadily being brought up to code on all fronts – electrical, plumbing, fire safety, accessibility…  It’s a journey, and it’s a good one.









Related

There is no related article.